项目选题:

电梯调度算法的实现和测试

项目背景:

Imagine we’re building a tall office building, it has the following configuration about elevators:

Building has 21 floors, 4 elevators, many passengers use these elevators everyday (passenger weight: average 70kg. max 120kg, min 45kg).

Other constant data: Elevator speed, door open/close time, passenger time for going in/out of the elevator.  We can make reasonable assumptions about these.

The building has 21 floors, from floor 0, 1, ... to 20.  Floor 0 is the underground parking level, floor 1 is the lobby level. Most people come in/out the building via these 2 floors.

 

Elevator name

Service floor list

Passenger limit

Weight limit

1

1, 10-20

12

1000 kg

2

0-10

10

1000 kg

3

1, 10-20

20

1500 kg

4

0-20

20

2000 kg

需求分析:

功能需求

1、四台电梯同时工作

2、随机在各楼层生成乘客信息

3、开始工作后不能有乘客无法抵达目的楼层

4、生成并记录个乘客抵达目的地的总用时

性能需求

1、具有高可靠性和容错能力

2、具有安全检查机制

 

 

 项目目标:

1、程序模块化设计

2、记录每个人的总路程时间

3、完成测试

UML图

将本次实验对象确定为电梯,乘客,楼层

因为有大量的相关多个对象操作,所以也可以将操作设为一个对象类

这样分类后,各物体类中只存在类的属性和检索类的数据的方法,将修改数据的操作都放在操作类内,这样分类后产生的UML图如下:

 

 

时间及任务划分:

第一周:设计大致模块。

第二周:每人进行相关知识的学习,并讨论细化程序。

第三至五周:分工完成程序。

第六至七周:测试并优化程序,根据情况增加相应功能模块。

第八周:进行最后微调并检查。